Outdoor rental LED panels: IP ratings, heat and power
Mark the front and rear exposure separately on the stage plan. Matrix 500 outdoor and Lite outdoor specify IP65 on both faces. X-1000 specifies IP65 front and IP54 rear. The crew’s cable route and access behind the wall belong on the same drawing.
Three outdoor rental builds
| Силсилаи берунӣ | Пеш / қафо | Натиҷаи стандартӣ | хизматрасонӣ |
|---|---|---|---|
| Матритса 500 | IP65 / IP65 | 4,500 мехоҳад | Пеш ва қафо |
| X-1000 | IP65 / IP54 | 4,500 мехоҳад | пеш |
| Лит | IP65 / IP65 | 3,500 мехоҳад | пеш |
Select the exact brightness version before requesting peak input and distribution details. Matrix 500 outdoor P3.9 and P4.8 have a separate 6,500-nit configuration. The X-1000 option reaches up to 5,000 nits.
Trace the rear exposure
On a roofed stage, rain can still approach from the open rear or side. Mark the final position of connectors, closures, cable drops and access points. Give the supplier a rear elevation and ask how each interface is protected in the operating configuration.
Review heat at the operating point
Describe afternoon sun, show duration and any scenic backing that limits airflow. Request the operating range and electrical sheet for the specific order. Check the assembled screen at the intended brightness during acceptance and agree how the crew will inspect the system between shows.
Mark the rain exposure on a rear elevation
Consider a roofed stage with an open loading side. A roof covers the top of the wall while driven rain may reach the rear connectors. On the rear elevation, draw the prevailing weather direction, cable entry points, service openings and where the crew can inspect them. Mark any planned scenic covering and send the drawing with the outdoor model request.
| Дар рӯи расм | What to obtain before ordering |
|---|---|
| Face and rear exposure | Supplier confirmation of the exact cabinet’s front and rear ratings and the required assembled connector configuration |
| Plug entries and closures | A photograph or drawing of the specified connectors and caps in their operating positions |
| Backing and service corridor | An approved clearance drawing showing the air path and access with the scenery installed |
For the same site, compare X-1000’s IP65 front and IP54 rear with the IP65 front and rear ratings of outdoor Matrix 500 or Lite. Select against the actual rear exposure and approved installation. The cabinet rating alone does not establish that the assembled stage, cabling and power distribution are suitable for that site.
Specify the heat and electrical review
Give engineering the expected air temperature at the wall, the period in direct sun, the show duration and the planned screen brightness. Request the operating limits, ventilation clearance, average and maximum consumption, and the units for the exact SKU and brightness option. An afternoon outdoor rehearsal and an evening show can need different operating settings on the same wall.
If the approved electrical sheet gives maximum consumption in W/m², multiply it by active area to obtain a display-only planning figure. A 6 × 3 m face has 18 m². Leave the watts field open until the correct sheet is attached. The venue electrician needs that figure, the prescribed supply details and the separate equipment loads to plan distribution. Record the agreed configuration and who can approve a change if the scenic backing moves.
- мавзӯъ
- outdoor rental LED panel IP rating
- Интихоб
- Mark the front and rear exposure separately on the stage plan. Matrix 500 outdoor and Lite outdoor specify IP65 on both faces. X-1000 specifies IP65 front and IP54 rear. The crew’s cable route and access behind the wall belong on the same drawing.
- Танзимот
- Select the exact brightness version before requesting peak input and distribution details. Matrix 500 outdoor P3.9 and P4.8 have a separate 6,500-nit configuration. The X-1000 option reaches up to 5,000 nits.
Does an overhead stage roof settle the choice of outdoor cabinet?
How do I compare IP65 front and IP54 rear with IP65 on both faces?
What thermal information should accompany a request for an outdoor rental wall?
Which consumption figure belongs on the venue electrical worksheet?
What should I check if the rear drape moves closer after the design is approved?
What should the sample inspection show about exposed plugs and spare ports?
Талаботи равшании худро муҳокима кунед
Ба мо бигӯед, ки экран чӣ кор кардан лозим аст. Мо метавонем конфигуратсияи Square-ро пешниҳод кунем ва тафсилоти равшанӣ ва қувваи барқро барои нархномаи шумо тасдиқ кунем.
Дархост Quote